Equipment & Technology

Select the equipment.
Define everything around it.

Equipment and technology for generation, storage, grid infrastructure, data centres and industry.

Substation with a power transformer and high-voltage switchyard, adjacent battery energy storage and wind turbines beyond
Delivered by Lurizon Energy

Switchgear.
A demonstrated track record.

Lancaster Solar Farm: 13 Siemens 8DA10 panels.
RPA Bradken Expansion: 19 Siemens 8DJH panels supplied.

Broader manufacturing access

More technologies.
A defined supply route.

Transformers, BESS, grid support, wind and generation technologies through Shanghai Electric and selected manufacturers.

Each offer identifies the manufacturer, scope, approval requirements and support arrangements.

How the relationship works
Illustration of a utility power transformer and shunt reactor in a substation
Generation / Storage / Grid

Power Transformers & Reactors

Power transformers, generator step-up transformers, distribution transformers, autotransformers, shunt reactors and associated equipment.

Manufacturing partner accessOur manufacturing relationship
Discuss requirements

Start with these inputs

  • Application, voltage, capacity and operating duty
  • Impedance, losses, cooling, bushings and tap-changer requirements
  • Site interfaces, access and transport limits

Confirm the supply basis

  • Manufacturer, configuration and technical departures
  • Test requirements, drawing approvals and production milestones
  • Delivery boundary, spares and warranty responsibilities
Additional equipment & technology

Supporting equipment.
Emerging technologies.

Manufacturer, availability and project suitability confirmed for each enquiry.

Broader Shanghai Electric portfolio

Hydrogen & Electrolysers

Hydrogen and electrolyser options assessed through Shanghai Electric’s broader portfolio.

Before ordering

Confirm the
equipment offer.

Evidence to confirm before the equipment order
DecisionWhat the review needsWho approves
Technical fitDesign basis, ratings, departures and interface drawingsAppointed design authority
ManufacturerExact factory, configuration and relevant product evidenceClient procurement and technical team
ProgrammeDrawing dates, production assumptions, tests and delivery boundaryProject team and contracted supplier
AcceptanceInspection plan, factory tests and release requirementsAuthorised release parties
SupportWarranty obligations, escalation, spares and site-service scopeContracting parties

Have a specification
or a single-line diagram?

Discuss the equipment
Lurizon Energy